新聞中心
NEWS CENTER
聯(lián)系我們
CONTACTS US
濟南皓暉建材有限公司,總部位于中國泉城——山東濟南,是一家專業(yè)生產(chǎn)銷售石塑電梯門套,仿大理石電梯門套的專業(yè)廠家。皓暉建材在電梯門套生產(chǎn)行業(yè)很多年,憑著優(yōu)質(zhì)的產(chǎn)品質(zhì)量和完善的售后服務,在全國各地都有我們的工程案例。
我們本著“以質(zhì)量求生存 ,靠管理出效益,憑信譽贏口碑,以實干筑輝煌”的經(jīng)營理念,公司將立足于當代建材現(xiàn)代化發(fā)展前沿,依靠科技、勇于探索,以優(yōu)質(zhì)產(chǎn)品優(yōu)良服務、信譽與廣大用戶攜手共創(chuàng)輝煌。
聯(lián)系電話: 15853163650
工廠地址:山東濟南章丘區(qū)(歡迎廣大客戶來廠勘察)
行業(yè)新聞
COMPANY NEWS
電梯門套安裝時的四大要點
2018-06-07 10:57:38 文章來源:www.leo918.cn
Today's weather is still high temperature warning, light through the clouds, sowing to the earth, but compared to yesterday's orange warning to the yellow warning. Although the warning has dropped, the temperature is still relatively high. People go out or pay attention to sunstroke prevention and sunscreen.
The following Ji'nan Hao Hui building materials to give you an analysis of the four main points of the elevator door installation.
第一、電梯門套平面基準線
電梯門套的龍骨安裝調(diào)整完畢后,需要平面線通常選在石材平面右側轉(zhuǎn)角的地方。吊線要全面考慮花崗石與其他材料的搭配,每個平面的轉(zhuǎn)角均應吊鉛垂線。
First, the plane base line of the elevator door
After installing and adjusting the keel of the elevator door, we need the place where the plane line is usually chosen on the right corner of the stone plane. The suspending line should consider the matching of granite and other materials, and the plumb line should be hung at every corner of the plane.
根據(jù)規(guī)劃及施工現(xiàn)場情況確定電梯門套的底邊地方,在兩條鉛垂線之間拉一條水平線。水平線和垂線確定電梯門套的位置。
Second, pull the horizontal line
According to the planning and construction site conditions, determine the bottom edge of the elevator door, and pull a horizontal line between the two plumb lines. The horizontal line and the vertical line determine the position of the elevator door.
第三、裝石材板塊
調(diào)整微調(diào)螺栓,調(diào)整平齊,緊固螺栓,安裝止滑螺栓。后一塊板的安裝以前一塊板及縱橫平面線為準,其他的安裝也是如此進行。
Third. Loading stone plate
Adjust the fine-tuning bolt, adjust the leveling, tighten bolts and install the skid bolts. Before the installation of one plate, one plate and horizontal plane line shall prevail. Other installation is also carried out.
第四、加固:調(diào)整后及時加固,保證每一個電梯門套安裝完美和安全。
Fourth, reinforcement: timely reinforcement after adjustment, ensuring that every elevator door is installed perfectly and safely.